Bp 92 en

From DCEwiki
Revision as of 23:54, 26 August 2014 by Sturcmar (talk | contribs) (Zobrazení PDF náhledů v rámečkách.)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Parallel Algorithm for Hoist Scheduling

Author: Michal Smola

Bakalářské práce 2007

Download thesis in PDF

The main aim of the work is to evaluate existing serial algorithms solving problem called hoist scheduling, develop parallel algorithm for this problem and implement it in C language using MPI (message passing interface). The study also compare speeds of serial and parallel algorithms.


Bp 2007 smola michal.pdf